After years of procrastination and delay, I met with the building inspector to review our plans for finishing the basement. I showed him my drawing, and reviewed some of the details. He made a couple of suggestions: since we will be reducing the room size around the furnace, I need to provide vents in the wall. We discussed my interest in doing the electrical work myself. He lectured me on how it is not trivial work, that I have the legal right to apply for a permit, but the electrical inspector will only give it to me if he thinks I can do the work well.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment